The short answer
Build a facilities plan with four parts: an asset list of every building system, a yearly calendar of inspections and preventive maintenance, a single system for repair requests with agreed priorities, and a maintenance budget based on the value of your buildings. Review it every term with your principal or business manager.
The need is real. The U.S. Government Accountability Office found in 2020 that an estimated 41% of school districts needed to update or replace heating, ventilation and air conditioning (HVAC) systems in at least half of their schools, about 36,000 schools. Facts in this post were checked on 19 November 2026.
Step 1: Know what you have
You cannot schedule maintenance for equipment you have not listed. Start with an asset inventory for each building:
| System | What to record |
|---|---|
| HVAC | Units, location, age, filter sizes, service contractor |
| Roof | Type, age, last inspection, warranty |
| Plumbing and water | Fixtures, water heaters, drinking water outlets |
| Electrical and lighting | Panels, emergency lighting, generators |
| Fire and life safety | Alarms, sprinklers, extinguishers, exit signs |
| Doors and security | Locks, access control, cameras |
| Grounds | Playgrounds, fields, paving, fencing |
| Kitchen | Refrigeration, ovens, dishwashers, hoods |
For each item note its age, expected life and condition. GAO found that about two thirds of districts had carried out a facilities condition assessment in the previous ten years; if yours has not, a professional assessment is a good starting point for a long term plan.
Step 2: Plan inspections on a calendar
Some checks are required by law and some are good practice. Put both on one calendar with an owner for each.
| Check | How often | Notes |
|---|---|---|
| Asbestos reinspection (AHERA) | At least every 3 years | By an accredited inspector, under 40 CFR 763.85 |
| Asbestos periodic surveillance | At least every 6 months | Required under 40 CFR 763.92 |
| Fire alarms, sprinklers, extinguishers | As set by your fire code and local fire marshal | Keep certificates on file |
| HVAC filters and service | Often monthly to quarterly, per manufacturer | Linked to indoor air quality |
| Playground safety | Regularly, plus after storms | Check surfacing, fixings and sharp edges |
| Roof and gutters | Spring and autumn | Clear drains before heavy rain |
| Drinking water outlets | As your state or district requires | See EPA's 3Ts guidance below |
Asbestos rules also cover staff: under 40 CFR 763.92, maintenance and custodial staff working in buildings with asbestos containing material need at least two hours of awareness training, and new staff must be trained within 60 days of starting.
For indoor air, EPA's Indoor Air Quality Tools for Schools program offers free checklists and guidance. For lead, EPA's 3Ts for reducing lead in drinking water (training, testing and taking action) is voluntary guidance; EPA states there is no safe level of lead in drinking water, especially for children. Check what your state requires.
Step 3: Log every repair request in one place
Requests arrive by email, hallway conversation and notes on the office desk, and that is how they get lost. Use one route for all requests.
- One form for everyone. Staff submit the location, the problem, a photo if possible and how urgent it seems.
- Triage daily. The facilities lead assigns a priority, an owner and a target date.
- Tell the requester. A short acknowledgment and a note when the job is done stop repeat requests.
- Record what was done, including parts, time and cost, against the asset.
- Review the log monthly for repeat problems. Three calls about the same boiler means it needs a decision, not another repair.
A simple priority scale keeps decisions consistent:
| Priority | Examples | Target response |
|---|---|---|
| 1. Emergency | Gas smell, flooding, no heat in winter, broken exterior door lock | Immediately |
| 2. Urgent | Broken toilet, failed classroom lighting, leaking roof | Within 1 to 2 school days |
| 3. Routine | Sticking door, damaged ceiling tile, paint | Within 2 weeks |
| 4. Planned | Upgrades and improvements | Scheduled into holidays |
Adjust the targets to your staffing, but write them down and share them with staff.
Step 4: Schedule preventive maintenance
Preventive maintenance is work done before something breaks: changing filters, servicing boilers, cleaning gutters, testing generators. It reduces emergency repairs and helps equipment last longer.
- Turn manufacturer guidance into recurring tasks for each asset in your inventory.
- Use school holidays for disruptive work such as floor refinishing or major HVAC servicing. Our guide to building a school master calendar shows how to reserve those windows early.
- Plan around the school day. Schedule noisy work outside lesson time and avoid exam weeks.
- Coordinate rooms. When a classroom is out of use for repairs, move classes in the timetable rather than improvising on the day. See how to prevent double booked rooms and teachers.
Step 5: Budget for upkeep
Maintenance is often the first line cut when budgets are tight, and the cost comes back later as bigger repairs. The 21st Century School Fund's State of Our Schools 2021 report describes common benchmarks based on a building's current replacement value (CRV), what it would cost to rebuild today:
| Benchmark from the 2021 report | Share of current replacement value per year |
|---|---|
| Typical maintenance and operations benchmark | 2% |
| Maintenance and operations used in the report (includes security and utilities) | 3% |
| Capital renewal and investment | 4% |
The same report estimated that districts spent about $56 billion a year on maintenance and operations in fiscal years 2017 to 2019, against a $84 billion standard, a shortfall of about $27.6 billion a year.
To use this locally:
- Estimate the replacement value of each building, or use your insurance values as a rough guide.
- Compare your current maintenance spending with the benchmark.
- Separate routine maintenance from capital projects in the budget, so one does not quietly absorb the other.
- Build a five year capital plan for roofs, HVAC and other big items, using the ages and expected lives in your inventory.
- Keep a contingency for emergencies.
Our guide on how to build a school budget explains how to fit facilities into the wider budget cycle.
Step 6: Staff, contractors and records
- Name one facilities lead for each site, even in a small school, and a backup.
- Keep contractor details, contracts and certificates in one shared place.
- Record keys and access cards issued and returned.
- Keep inspection reports and logs for as long as your district or state requires.
- Include facilities in emergency plans. Shutoff locations for gas, water and electricity should be known to more than one person. See our school safety drills guide.
Facilities and maintenance checklist
- Asset inventory for every building, with age and condition
- Facilities condition assessment within the last ten years
- One calendar with all required inspections and owners
- AHERA reinspection and 6 month surveillance on schedule
- Staff asbestos awareness training up to date
- One route for repair requests, triaged daily
- Written priority levels and target response times
- Preventive maintenance tasks scheduled for each asset
- Disruptive work booked into school holidays
- Maintenance budget compared with a replacement value benchmark
- Five year capital plan
- Contractor certificates and inspection records filed
How Borderset helps
Borderset is a school management system rather than a facilities work order tool, but it helps with the school side of maintenance. Schedule management lets you move classes when a room is out of use and avoid double booking, announcements to families keep parents informed about closures or works, and teacher tracking helps leaders see which staff are affected by room changes. To see it with your own timetable, book a demo.
Related reading on Borderset
For related operations topics, read about school transportation planning, running school lunch and cafeteria operations and school data backups and continuity planning.
Frequently asked questions
How often do schools need asbestos inspections?
Under the federal AHERA rules, schools must reinspect known or assumed asbestos containing material at least every three years and carry out periodic surveillance at least every six months.
What is preventive maintenance in a school?
Planned work done before equipment fails, such as changing HVAC filters, servicing boilers and clearing gutters, scheduled from an asset list and manufacturer guidance.
How much should a school spend on maintenance?
A common benchmark cited by the 21st Century School Fund is about 2% of a building's current replacement value per year for maintenance and operations, with a further amount for capital renewal.
How should schools prioritise repair requests?
Use written priority levels, for example emergency, urgent, routine and planned, each with a target response time, and triage new requests daily.
How many schools need HVAC upgrades?
GAO estimated in 2020 that 41% of districts needed to update or replace HVAC systems in at least half their schools, about 36,000 schools.
Who should manage facilities in a small school?
Name one facilities lead and a backup, even if it is part of another role, and give them one calendar, one request log and the budget.